The Design Review Committee required a revised site plan and additional architectural details before making a determination for the Planning Board or allowing a building permit to proceed.
Open the committee coverage hubs tied to this summary.
Was this summary helpful?
Your feedback helps us prioritize what to improve next.
The committee found the revised side elevations and curved roof detail acceptable but said the lower two floors facing the street looked too boxy. The applicant must consider added trim, roof details, façade changes, and railing features, screen HVAC equipment from the adjacent walkway, and submit final materials and a revised site plan for another review.