Quick context to catch up fast.
The Board unanimously approved Application A-4 for redevelopment of the existing gas station at 2257 Wadsworth Road, including setback, lot coverage, signage, and riparian setback variances. Approval requires compliance with all City Engineer requirements, particularly those involving the riparian setback near Wolf Creek.
Browse all related coverage for the main local project pages tied to this summary.
Open the committee coverage hubs tied to this summary.
Was this summary helpful?
Your feedback helps us prioritize what to improve next.
The approved plan will rebuild and reconfigure the gas station, move underground tanks outside the riparian setback, and reduce the site's impact near the creek. The redesigned layout includes a one-way entrance, more space between fuel dispensers, and updated tanks and leak detection systems intended to improve traffic flow and safety. The plan also includes stormwater improvements and a replacement sign that remains below the maximum permitted signage area.
Follow the major takeaways from this briefing.
Action items flagged by the community.
No follow-ups have been shared yet. Add one in the community board below.
Details and records from this meeting.
Fresh records from this municipality.
Know who to contact about the decisions that matter.