Quick context to catch up fast.
The Engineering Committee unanimously approved two CDM Smith contracts totaling up to $337,845: $107,845 for a pump-building odor and ventilation assessment and $230,000 to design and oversee replacement of a chemical odor-treatment system.
Open the committee coverage hubs tied to this summary.
Was this summary helpful?
Your feedback helps us prioritize what to improve next.
The first contract will study airflow, moisture, hydrogen sulfide, and possible improvements to reduce odors at the headworks. The second covers design and construction administration for replacing the 3,000 CFM chemical wet scrubber serving the Sludge Disposal and Dewatering Building basement. A peroxide odor-control pilot is planned for late June or July, while a proposed Scentroid monitoring system was postponed.
Follow the major takeaways from this briefing.
Action items flagged by the community.
No follow-ups have been shared yet. Add one in the community board below.
Details and records from this meeting.
Fresh records from this municipality.
Know who to contact about the decisions that matter.