Quick context to catch up fast.
The Engineering Committee unanimously recommended three bid waivers totaling $892,896.79 for replacement of critical wastewater equipment, including a clarifier column and grit-removal equipment. The committee also reviewed odor-control testing and a peroxide pilot planned for spring.
Open the committee coverage hubs tied to this summary.
Was this summary helpful?
Your feedback helps us prioritize what to improve next.
The proposed equipment replacements are intended to maintain treatment operations at the Mattabassett District facility. Odor-control testing will measure hydrogen sulfide levels, while a peroxide pilot is planned to reduce odors affecting the public and employees. A proposal for continuous odor monitoring and predictive modeling was tabled for the next Engineering Committee meeting.
Follow the major takeaways from this briefing.
Action items flagged by the community.
No follow-ups have been shared yet. Add one in the community board below.
Details and records from this meeting.
Fresh records from this municipality.
Know who to contact about the decisions that matter.