Quick context to catch up fast.
The agency unanimously upheld a cease-and-desist order for excavation near 92 Post Office Road, where staff reported possible wetlands impacts and initially found no erosion controls. The vote was 8-0.
Open the committee coverage hubs tied to this summary.
Was this summary helpful?
Your feedback helps us prioritize what to improve next.
Further excavation connected to extending water service at 92 Post Office Road must stop while the violation remains under review. Erosion and sediment controls have since been installed, and staff will follow up with the Engineering Department. The agency also required a public hearing for a proposed nine-lot subdivision at 100 and 85 Bright Meadow Boulevard.
Follow the major takeaways from this briefing.
Action items flagged by the community.
No follow-ups have been shared yet. Add one in the community board below.
Details and records from this meeting.
Fresh records from this municipality.
Know who to contact about the decisions that matter.